group of people sitting at a table having a discussion
black consultation icon

Consultation

During our initial consultation, we'll discuss critical components to your custom home. This includes style, land options, budget considerations, and timeline. This information helps guide our decisions in order to meet your specific goals.

01
12
black design icon

Design

During the design phase, we'll discuss things like overall feel of the home, style preferences, room dimensions, how to optimize views, new product integration, and interior carpentry. From this discussion, we digitally build your home before ever driving a nail. This includes 2D plans, but it can be as elaborate as 3D renderings and virtual walkthroughs.

02
12
black documents icon

Documents

To implement a new home project, we custom tailor a final specifications document, review building plans, sign contracts, and formulate a construction schedule.

03
12
black bulldozer icon

Foundation

We start breaking ground during the foundation phase. This will include site preparation, excavation, rough grading, concrete forming, and foundation walls. Other site improvements are made in preparation for the carpenters.

04
12
black home framing icon

Framing

During the framing phase, your custom home starts to take shape. Carpenters arrive and the subfloor, walls, and roof structures are built.

05
12
black mechanical icon

Mechanical

At this step, we'll do a walkthrough together to identify the placement and type of all fixtures, switches and outlets, keeping furniture placement and built-ins in mind. We also prepare your home for rough plumbing, HVAC duct installation, electrical, specialty mechanicals, audio/video, and security.

06
12
black home insulation icon

Insulation

In addition to installing insulation to prepare for drywall, we also call for all inspections including municipal and third party energy audits.

07
12
black home construction tools icon including screwdriver and wrench

Interior Finish

Finishing the interior is an exciting phase for homeowners. This includes interior painting, carpentry such as cabinets and stairways, drywall, stone and tile work, flooring, specialty items, and many other detail items.

08
12
black home exterior icon

Exterior Finish

During this step, we'll meet to discuss and layout the locations of all planting areas, sidewalks, driveways, and trees. Exterior finishes include grass sod, concrete, pools, spas, patios, landscape, irrigation, and masonry work.

09
12
black home move-in icon

Move In

It's the day you've been waiting for! Your custom home will have a final cleaning and be ready for your furniture. Your project coordinator will meet with you to discuss all mechanical and electrical systems. Enjoy your new home!

10
12
black calendar icon showing 60 days

60-Day Walkthrough

You'll meet with your project coordinator sixty days after move in to identify any items that need adjusted, touched up or repaired.

11
12
black calendar icon showing 120 days

120-Day Walkthrough

You'll meet with your project coordinator twelve months after move in. We will again identify any items that need adjusted, touched up or repaired.

12
12

Contact Us

Get in touch with the Hoss Homes team.

At Hoss Homes, our focus is on you. Do you have a question about our homes, process, or company? Let us know how we can help, and someone from our staff will be in touch as soon as possible.

black checkmark icon
Thanks for reaching out.
Someone from our team will get in touch with you as soon as possible.
Steve Hoss
Steve
Ron Norris
Ron
Colin Hoss
Colin
Nigel Hoss
Nigel
Nicole Loomis
Nicole
Oops, something went wrong. Please try again or contact us.